Projekt details
Locality: Čitluk, B&H
Name of contracting authority: Tempo-Vranica d.d. Mostar
Type of provided services: Production control
Recently in Portfolio
- Preliminary geotechnical design, Mission G1 within the main project of the bypass of Donji Vakuf
- Mission G31 i G32 Rehabilitation of the slope above the facility of HPP Rama
- Mission G41 and G42 – Bazaar, Mala Tepa, Mostar
- Harmonization of the main design of motorway, section Buna – Počitelj
- Program of investigation works, Mission G1 and G21 for main design of Bypass of Cazin
- Tunnel “Žaba” – Geotechnical design, appendix
- Master plan of West Herzegovina County and master plan of municipalities Posušje, Grude, Ljubuški and Široki Brijeg
- Technical observation and interpretation of results of geodetic measurements on dams Kazaginac, Podgradina and Mandak
- Mission G31 and G32 for objects no. 2 and no. 3 of residential-business comlex “Kapetanovina”
- Mission G31 and G32 for object no. 4 of residential-business comlex “Kapetanovina”
- Geomechanical elaborate on location of future commercial building of Elekroprijenos B&H
- Geomechanical elaborate for residential-business building “Cesars”, Lacina street, Mostar
- Main design for the construction of the “Žaba” tunnel (L = cca 975 m) on the road M17.3 Neum – Stolac, Section Bročanac – Drenovac
- Geotechnical elaborate for the retaining wall on the right coastal sewage collector in Mostar
- Geotechnical study with laboratory tests under the project “Dual sewage collectors in central area of city of Mostar – tunnels and inverted siphons”
- The interpretation of technical monitoring of hydropower plants (HPP Mostar, Rama, Čapljina, Jajce1, Jajce 2, Peć Mlini, Mostarsko Blato)
- Development of Preliminary and Main Design of the expressway Mostar-Široki Brijeg-border of the Republic of Croatia, section Polog-border of the Republic of Croatia (40.5 km)
- Mission G23 (revision) for reconstruction and upgrading of the restaurant in Mostar
- Mission G31 and G32 for gas stations “Kravice Left” and “Kravice Right”, with examination of modulus of compressibility (part I)
- Mission G31 and G32 for gas stations “Kravice Left” and “Kravice Right” (part II)
- Geotechnical elaborate and geotechnical design – Mission G21 for the purpose of reconstruction, extension and upgrading business object in Mostar, Fortuna tours
- Preliminary geotechnical design – Mission G1 – Vila Fortuna
- Mission G41 and G42 – Reconstruction and rehabilitation of Musafirhana (Šarića Han) Stolac
- Mission G23 – upgrading of residental object in Tito’s street in Mostar
- Geotechnical report with geotechnical design – Mission G21 for Roof rehabilitation project of building of Red Cross Society of B&H
- Revision of main geotechnical design for the purpose of reconstruction of the boarding house and bazaar – Onešćukova 23, Mostar
- Revision of geotechnical elaborate and geotechnical design – manufacturing complex “FEAL”
- Geotechnical missions G31 and G32 for the section of Corridor Vc, Počitelj-Bijača, subsection Zvirovići-Međugorje
- Preparation of technical documentation of the main design of route and preliminary design of facilities of Southern Bypass of Mostar, M17, section Miljkovići – Rodoč
- Geological-geomechanical investigative works for the purpose of construction of a residential-business object “Mljekara”
- Videoprospection of piezometric boreholes of HP Rama
- Consultancy services (preparation of geological bases) for the development of the main project of arranging the river Rakitnica
- Main design of rehabilitation of damaged asphalt roadway on the main road M6, section Gorica-Vitina, L=4.2 km
- Services of geotechnical investigative works and preparation of geomechanical elaborate on the location of social housing building in Prozor
- Revision of the project documentation of the preliminary design for drinking water preparation at the location Senjakovina, the water supply system of Posušje
- Development of project documentation for the rehabilitation of the M17 Čole-Lager route, arranging the bed of Željeznica river, rehabilitation of the Old road-Papratnica, arranging the Papratnica riverbed as well as the bottom of Džamijaš stream
- Development of geomechanical elaborate on the location of access road for wastewater treatment plant
- Revision of project documentation of main design of rehabilitation of the landfill Klepovica”
- Revision of the investment-technical documentation of the preliminary design HPP Janjići
- Geotechnical monitoring works geotechnical mission G32 – LOT 1 Corridor Vc section Svilaj – Vukoslavje (7 facilities)
- Geotechnical monitoring of works geotechnical mission G31 and G32 for waste water treatment plant in Mostar
- Development of the motorway design, section Zvirovići-Bijača, from km 14+665 to km 14+735 – shortening of the tunnel “Bijela Vlaka”
- Geotechnical monitoring of works, Mission G32 as a part of the project for wastewater treatment plant in Bihać
- Geotechnical design (Mission G21) as a part of the main design for obtaining building permits for WPP Debelo Brdo on Kupres
- Environmental Impact Study for Imotsko- Bekijsko Field
- Strategic Environmental Impact Study of Water Management Plan of the Adriatic Sea Water Region
- Waste Management Plan for the Mostar South Bypass
- Revision of geotechnical elaborate with geotechnical design (Mission G23) – reconstruction and outhouse of residental-business object in a street Jusovina bb, Mostar
- Mission G23 – Rehabilitation of roadway surfaces and refurbishing of Hrvoje Vukčić Hrvatinić Street in Jajce
- Missions G31 i G32 for object no. 1 of residental-business complex “Kapetanovina”
- Geotechnical missions G41 and G42 for Hotel “Almira”
- Geotechnical missions G31 (with translation) for the Vrbovac underpass on the motorway, section Svilaj-Odžak
- Mission G31 for manufacturing and warehouse facility “Presal Extrusion”
- Geomechanical report and geostatic analysis of residential-business objects, blocks 4,5 and 6 (buildings 1,2 and 3), Luč in Trebinje
- Mission G23 (revision) of terminal for truck weighing of thermal power plant Kakanj
- Bosnian house as part of the ensemble of Sultan Esma’s Mosque
- Geotechnical elaborate for residental-business object “Stara pilana”, E-12, Nevesinje
- Geological-geomechanical works for power line Tomislavgrad-Kupres, section SM (27) Mokronoge – TS Kupres
- Supervision over the execution of works on rehabilitation of the roadbed settlement on the main road M16.2_003, section: Prozor – Jablanica km 20+700
- Supervision over the performance of works of Ilumination of the Old Town Blagaj (Herceg Stjepan Fortress City) in Blagaj near Mostar
- Construction supervision over the performance of works: Investment maintenance of bridges – replacement of dilatations: – Bridge M1.8_004_113 over the river Tinja, Orlova klisura, Srebrenik – Šički Brod 3; – Viaduct M16.2_003_336 Novogodišnja ruč, Section Prozor – Jablanica 1; – Viaduct M17-012-302 Ostrožac, Section Konjic – Jablanica 1; – Viaduct M20-009-208 Osanica, Section Ustikolina – Goražde 8
- Supervision of the construction of the connecting road from Misišta to Cemeterie of Peace, Bile
- Project of Sustainable Management of Forests and Landscapes – Reconstruction / construction of the fire road Gornji Vlašani – Posušje, GJ Posušje in length of 3 km
- Supervision over construction of a pedestrian pathway on the road M6.1 road, section Kablići – Priluka
- Supervision over the works of exceptional maintenance of regional roads in the West Herzegovina County
- Construction supervision over the performance of works on the project – Rehabilitation of the bridge across the river Vrioštica on Road M6, km 31+216, Section Grude – Ljubuški
- Services of supervision over the performance of works on the construction of mini hydropower plants “KRALJUŠČICA K-1” and “KRALJUŠČICA K-2” in Municipality of Konjic: 1) construction of access and service roads, 2) pipeline construction, 3) construction of water intakes and 4) construction of powerhouse.
- The technical supervision of works on the reconstruction of flood damage, public infrastructure in areas in the Municipality of Čapljina, Ravno and Neum
- Consulting services for Technical supervision of Works on Flood Damage Rehabilitation of Public Infrastructure on sites in Tomislavgrad Municipality
- Construction supervision over continuation of works on the bridge Sutina in Mostar
- Consalting services for Technical supervision of Works on primary school “CIM” Mostar
- Supervision of construction-artisanal works on the project of reconstruction of war crimes courts in B&H (altogether 11)
- Development of the main project and supervision of construction and electrical works at installation of VHF antenna at location Bukovik
- Supervision on the construction of belfry of the church of St. Ivan the Baptist
- Supervision over the rehabilitation of the right embankment along the Krupa River – Karaotok
- Technical supervision of “Replacing the existing public lighting with the LED lighting”
- Construction supervision of the external lightning of the walls of the Old Town Blagaj in Blagaj near Mostar – LOT 1
- Supervision of works on rehabilitation of landslide next to the Jošanica toll station
- Design services on the project of rehabilitation of the structure and upgrading of the balcony on the building B2, Blažuj
- Drafting services of project documentation and supervision for the reconstruction of facilities of Energopetrol d.d. Sarajevo
- Designing the main project of the structure of a business-warehouse facility in Safet Zajko Street, Municipality of Novi Grad
- Main and detailed design of Structure of residential-business building in the street IV Viteške brigade 72, Ilidža
- Preparation of main design of warehouse Opine
- Preparation of technical documentation and supervision of works on the UniCredit Bank Office in Breza
- Preparation of technical documentation and supervision of works on the UniCredit Bank Office Mepas Mall in Mostaru
- Preparation of technical documentation and supervision of works on the UniCredit Bank Office in Rama
- Preparation of technical documentation and supervision of works on the UniCredit Bank Office Kovačići in Sarajevo
- Preparation of technical documentation and supervision of works on the UniCredit Bank Office in Čitluk
- Preparation of technical documentation and supervision of works on the UniCredit Bank Office Dobrinja in Sarajevo
- Preparation of technical documentation and supervision of works on the UniCredit Bank Office in Vogošća
- Development of investment-technical documentation for the construction of water collectors with pipeline and platforms for collecting rain water in returnee settlement Rabrani, LC Hrasno, Municipality of Neum
- Development of project documentation for the residential-business building “Mljekara”
- Main project of business building extension “Termomont”
- Development of project documentation for the reconstruction of a small hall of the Croatian Lodge “Herceg Stjepan Kosača” in Mostar
- Development of project documentation for reconstruction of premises behind the hall of the Croatian Lodge “Herceg Stjepan Kosača” in Mostar
- Services on drafting detailed design for energy efficiency rehabilitation of Psychiatric Hospital Mostar
- Revision of the project documentation of the main rehabilitation project of plateau CPE Centar Skenderija, Sarajevo
- Verification services of Project of load-bearing structure for objects K-36 i K-37
- Preliminary, main and detailed project of upgrading the hall in Mostar
- Supervision over the reconstruction of room intended for placement of secure server room in Mostar
- Main designs for construction, rehabilitation and reconstruction of fifty-four residential units in Orašje Municipality, LOT 2
- Verification services of Project of load-bearing structure for objects K-34 i K-35
- Detailed design of structure for residential-business building in Marko Marulić street in Sarajevo
- Services of stability check of object in Marshal Tito street in Sarajevo
- Verification services of Project of load-bearing structure for objects B1-B
- Control of the production of stone fractionated aggregate on the quarry Delića Brdo
- Technical cooperation on control of the production of stone fractionated aggregate on the quarry Ograina, Žepče
- Material Testing Services and Quality Control within the project “Wastewater Treatment Plant in Bihać”
- Testing of compressive strength of stone under the project of reconstruction of the “Braće Fejić” street in Mostar
- Quality control of concrete on facilities within the wastewater treatment plant
- Control of the production of aggregates for concrete at plant in Stolac
- Control of concrete production at concrete plant in Stolac
- Technical cooperation on quality control of concrete in the Paškić concrete plant at the location of Međugorje
- Technical Cooperation on the Control of Concrete Production in the Concrete Plant at location of Blizanci, Čitluk
- Technical cooperation on quality control of concrete during the construction of the building for permanent accommodation of Agency for Education and Professional Training in Mostar
- Control of Concrete Production in the Concrete Plant in Ostrožac, Cazin
- Control of the production of aggregate on the quarry Lapišnica, Istočno Sarajevo
- Control of concrete production at concrete plant in Odžak
- Quality control of concrete at seven facilities within the Corridor Vc, section Svilaj – Odžak
- Quality control of concrete on a residential-business building “Mljekara” in Mostar
- Control of the production of aggregates for concrete at plant in Odžak-Prud, AC Milan
- Concrete production control at the concrete plant Kuzmanović Komerc d.o.o. Modriča at the location of Modriča
- External quality control on the construction of the motorway on Corridor Vc, section Počitelj-Bijača, subsection Zvirovići-Kravice
- External control of applied materials on the construction of the Corridor Vc Motorway, section Vlakovo-Lepenica
- External control on the construction of motorway, section Počitelj – Bijača, Subsection 1 Kravice – Bijača (from km 16+000 to km 21+255)
- External contol of applied materials on the construction of the Corridor Vc Motorway, section Svilaj – Odžak
- External contol of applied materials on the construction of the Corridor Vc Motorway, section Kravice-Zvirovići
- Analysis of soil samples for the designed radio-poles foundations in Congo
- Testing the compressive strength and volume mass of concrete samples of residential – business object “Stara pilana”
- Geotechnical testing on Mini Hydropover plant RZA – 3 Valetovo, Višegrad
- Preliminary design and studies for obtaining urban planning permissions for section of a motorway on coridor Vc, Mostar Jug-Buna, subsecton Buna-Kvanj
- Development of preliminary project and studies for obtaining urban planning permissions for section of a motorway on coridor Vc, Mostar Jug-Buna, subsection Mostar Jug-Kvanj
- Revision of documentation of the tunnel projects “Novi” and “Privorac” within the southern bypass of Mostar, section Miljkovići – Rodoč – connection to M17 – LOT2
- Preparation of preliminary and main design for obtaining urban planning permissions and building permit for the construction of a flood protection dam Gabela Polje
- Environmental Action Plan of West Herzegovina Canton for period 2014 – 2024
- Project of a technical boreholes observation of hydropower plant Čapljina
- Geotechnical missions G31 and G32 for the construction of access roads and working plateaus of wind power plant Podveležje
- Technical supervision over road base settlement rehabilitation and an escarpment below finish road level, road M17_013, section Jablanica-Potoci, km 2+100 to km 2+400
- Supervision services over performance of works on project “Reconstruction of infrastructure in the cave Vjetrenica”
- Supervision services during construction of mini hydro power plant Glavica-Šipovo
- Technical supervision over remediation of the escarpemnt, road M17_013, section Jablanica – Potoci, km 7+200 to km 7+750, Komadinovo Vrelo
- Technical supervision of works on construction of the building for permanent accommodation of Agency for education and professional training, Rodoč bb, Mostar
- Supervision of final works on bridge Sutina in Mostar
- Technical supervision over renovation works of the building of Cantonal court and Cantonal prosecutor’s office in Mostar; Consortium of Institute IGH d.d. Zagreb and IGH d.o.o. Mostar
- Supervision over the execution of works on the construction of a unleveled pedestrian crossing in settlement Zalik – school Zalik
- Technical supervision over construction of the building of Cantonal court in Bihać, B&H. Supervision over construction-artisanal works on construction of the building in Bihać; Consortium of Institute IGH d.d. Zagreb and IGH d.o.o. Mostar
- Technical supervision over construction of a new wing of the building of the Prosecutor’s Office of B&H in Sarajevo. Supervision over construction-artisanal works on construction of the building in Sarajevo
- Quality control of concrete during construction of residental-business object “Oaza” in Dubrovačka street in Mostar
- Quality control of concrete during construction of residental-business object “Dva Cedra” in Mostar
- Production control of aggregates for concrete on separation in Jasenica
- Control of concrete production at concrete plant on location Jasenica
- Control of concrete production at concrete plant in Trno, Široki Brijeg
- Control of precast production at concrete plant in Trno, Široki Brijeg
- Control of concrete production at concrete plant in Domanovići, Čapljina
- Quality control of concrete at concrete plant Uzarići
- Control of concrete production for precast at concrete plant at location Drinovci, Grude
- Quality control of aggregate in a quarry Paljevine – Vlake
- Control of precast concrete production in a factory on location Ortiješ
- Laboratory testing of compressibility modulus and other asphalt layer tests
- Services of external quality control in the construction of section of a motorway Drivuša – Donja Gračanica, subsection Klopče – Donja Gračanica
- Control of concrete production at concrete plant on location Cebara, Tomislavgrad
- Quality control of concrete of subbase and embankment
- Development of technical solutions and technical documentation for fifty-four residential units in Mostar
- Supervision of platform expansion works
- Construction Supervision of Mostar South Bypass – Completion of road section Međine – Miljkovići, L= 6,7 km
- Supervision of works on rehabilitation of regional road R425a on Tromeđa-Zvirovići section in length of app 5,8 km
- Supervision over the construction of the Southern Bypass of Mostar – section Miljkovići-Rodoč-connection to M17, Part Roundabout Varda (P231) – entrance to the tunnel Novi (P280), L = 1.516m, including the viaduct “Marijanovića Draga” L = 200m
- Investigation works in the supply tunnel no. 2 plants of HPP Jablanica, including the rehabilitation project
- Supervision of lighting construction works on the platform
- Services of development of geological studies, exploratory drilling and excavation, geophysical research, laboratory tests, field tests, engineering geological and hydrogeological tests – Expressway Travnik – Jajce
- Geotechnical and geophysical investigations for WPP Poklečane
- Supervision over the execution of works on the rehabilitation of the road structure on the section Podlugovi – Sarajevo North