Home
Activities
About us
Projects
Reference Projects
Current Projects
Accreditations & Licenses
Contact
Home
Activities
About us
Projects
Reference Projects
Current Projects
Accreditations & Licenses
Contact
Reference Projects by Objects
Filter by Objects
Filter by Departments
SVI PROJEKTI
SVI PROJEKTI
AIRPORTS
BRIDGES
HOTELS
HYDROPOWER PLANTS
INDUSTRIAL HALLS
LANDSLIDES
MOTORWAYS
OTHER OBJECTS
RESIDENTIAL-BUSINESS BUILDINGS
ROADS
TUNNELS
VIADUCTS
Supervision of lighting construction works on the platform
Supervision of platform expansion works
Harmonization of the main design of motorway, section Buna – Počitelj
Development of preliminary project and studies for obtaining urban planning permissions for section of a motorway on coridor Vc, Mostar Jug-Buna, subsection Mostar Jug-Kvanj
Services of external quality control in the construction of section of a motorway Drivuša – Donja Gračanica, subsection Klopče – Donja Gračanica
Geotechnical missions G31 and G32 for the section of Corridor Vc, Počitelj-Bijača, subsection Zvirovići-Međugorje
Geotechnical monitoring works geotechnical mission G32 – LOT 1 Corridor Vc section Svilaj – Vukoslavje (7 facilities)
Development of the motorway design, section Zvirovići-Bijača, from km 14+665 to km 14+735 – shortening of the tunnel “Bijela Vlaka”
Waste Management Plan for the Mostar South Bypass
Supervision of works on rehabilitation of landslide next to the Jošanica toll station
Preliminary design and studies for obtaining urban planning permissions for section of a motorway on coridor Vc, Mostar Jug-Buna, subsecton Buna-Kvanj
Quality control of concrete at seven facilities within the Corridor Vc, section Svilaj – Odžak
External quality control on the construction of the motorway on Corridor Vc, section Počitelj-Bijača, subsection Zvirovići-Kravice
External control of applied materials on the construction of the Corridor Vc Motorway, section Vlakovo-Lepenica
External control on the construction of motorway, section Počitelj – Bijača, Subsection 1 Kravice – Bijača (from km 16+000 to km 21+255)
External contol of applied materials on the construction of the Corridor Vc Motorway, section Svilaj – Odžak
External contol of applied materials on the construction of the Corridor Vc Motorway, section Kravice-Zvirovići
Preliminary geotechnical design, Mission G1 within the main project of the bypass of Donji Vakuf
Program of investigation works, Mission G1 and G21 for main design of Bypass of Cazin
Services of development of geological studies, exploratory drilling and excavation, geophysical research, laboratory tests, field tests, engineering geological and hydrogeological tests – Expressway Travnik – Jajce
Supervision over the execution of works on the construction of a unleveled pedestrian crossing in settlement Zalik – school Zalik
Technical supervision over remediation of the escarpemnt, road M17_013, section Jablanica – Potoci, km 7+200 to km 7+750, Komadinovo Vrelo
Technical supervision over road base settlement rehabilitation and an escarpment below finish road level, road M17_013, section Jablanica-Potoci, km 2+100 to km 2+400
Preparation of technical documentation of the main design of route and preliminary design of facilities of Southern Bypass of Mostar, M17, section Miljkovići – Rodoč
Main design of rehabilitation of damaged asphalt roadway on the main road M6, section Gorica-Vitina, L=4.2 km
Development of project documentation for the rehabilitation of the M17 Čole-Lager route, arranging the bed of Željeznica river, rehabilitation of the Old road-Papratnica, arranging the Papratnica riverbed as well as the bottom of Džamijaš stream
Development of geomechanical elaborate on the location of access road for wastewater treatment plant
Mission G23 – Rehabilitation of roadway surfaces and refurbishing of Hrvoje Vukčić Hrvatinić Street in Jajce
Supervision over the execution of works on rehabilitation of the roadbed settlement on the main road M16.2_003, section: Prozor – Jablanica km 20+700
Supervision of the construction of the connecting road from Misišta to Cemeterie of Peace, Bile
Supervision over construction of a pedestrian pathway on the road M6.1 road, section Kablići – Priluka
Supervision over the works of exceptional maintenance of regional roads in the West Herzegovina County
Services of supervision over the performance of works on the construction of mini hydropower plants “KRALJUŠČICA K-1” and “KRALJUŠČICA K-2” in Municipality of Konjic: 1) construction of access and service roads, 2) pipeline construction, 3) construction of water intakes and 4) construction of powerhouse.
The technical supervision of works on the reconstruction of flood damage, public infrastructure in areas in the Municipality of Čapljina, Ravno and Neum
Consulting services for Technical supervision of Works on Flood Damage Rehabilitation of Public Infrastructure on sites in Tomislavgrad Municipality
Supervision of works on rehabilitation of regional road R425a on Tromeđa-Zvirovići section in length of app 5,8 km
Revision of geotechnical elaborate and geotechnical design – manufacturing complex “FEAL”
Mission G31 i G32 Rehabilitation of the slope above the facility of HPP Rama
The interpretation of technical monitoring of hydropower plants (HPP Mostar, Rama, Čapljina, Jajce1, Jajce 2, Peć Mlini, Mostarsko Blato)
Supervision services during construction of mini hydro power plant Glavica-Šipovo
Project of a technical boreholes observation of hydropower plant Čapljina
Videoprospection of piezometric boreholes of HP Rama
Revision of the investment-technical documentation of the preliminary design HPP Janjići
Geotechnical testing on Mini Hydropover plant RZA – 3 Valetovo, Višegrad
Investigation works in the supply tunnel no. 2 plants of HPP Jablanica, including the rehabilitation project
Geotechnical missions G41 and G42 for Hotel “Almira”
Supervision of final works on bridge Sutina in Mostar
Construction supervision over the performance of works: Investment maintenance of bridges – replacement of dilatations: – Bridge M1.8_004_113 over the river Tinja, Orlova klisura, Srebrenik – Šički Brod 3; – Viaduct M16.2_003_336 Novogodišnja ruč, Section Prozor – Jablanica 1; – Viaduct M17-012-302 Ostrožac, Section Konjic – Jablanica 1; – Viaduct M20-009-208 Osanica, Section Ustikolina – Goražde 8
Construction supervision over the performance of works on the project – Rehabilitation of the bridge across the river Vrioštica on Road M6, km 31+216, Section Grude – Ljubuški
Construction supervision over continuation of works on the bridge Sutina in Mostar
Master plan of West Herzegovina County and master plan of municipalities Posušje, Grude, Ljubuški and Široki Brijeg
Technical observation and interpretation of results of geodetic measurements on dams Kazaginac, Podgradina and Mandak
Geotechnical elaborate for the retaining wall on the right coastal sewage collector in Mostar
Geotechnical study with laboratory tests under the project “Dual sewage collectors in central area of city of Mostar – tunnels and inverted siphons”
Preparation of preliminary and main design for obtaining urban planning permissions and building permit for the construction of a flood protection dam Gabela Polje
Supervision services over performance of works on project “Reconstruction of infrastructure in the cave Vjetrenica”
Environmental Action Plan of West Herzegovina Canton for period 2014 – 2024
Drafting services of project documentation and supervision for the reconstruction of facilities of Energopetrol d.d. Sarajevo
Laboratory testing of compressibility modulus and other asphalt layer tests
Mission G31 and G32 for gas stations “Kravice Left” and “Kravice Right”, with examination of modulus of compressibility (part I)
Mission G31 and G32 for gas stations “Kravice Left” and “Kravice Right” (part II)
Mission G41 and G42 – Reconstruction and rehabilitation of Musafirhana (Šarića Han) Stolac
Consultancy services (preparation of geological bases) for the development of the main project of arranging the river Rakitnica
Revision of the project documentation of the preliminary design for drinking water preparation at the location Senjakovina, the water supply system of Posušje
Revision of project documentation of main design of rehabilitation of the landfill Klepovica”
Geotechnical monitoring of works geotechnical mission G31 and G32 for waste water treatment plant in Mostar
Geotechnical monitoring of works, Mission G32 as a part of the project for wastewater treatment plant in Bihać
Geotechnical design (Mission G21) as a part of the main design for obtaining building permits for WPP Debelo Brdo on Kupres
Environmental Impact Study for Imotsko- Bekijsko Field
Strategic Environmental Impact Study of Water Management Plan of the Adriatic Sea Water Region
Geotechnical missions G31 (with translation) for the Vrbovac underpass on the motorway, section Svilaj-Odžak
Mission G31 for manufacturing and warehouse facility “Presal Extrusion”
Mission G23 (revision) of terminal for truck weighing of thermal power plant Kakanj
Bosnian house as part of the ensemble of Sultan Esma’s Mosque
Geological-geomechanical works for power line Tomislavgrad-Kupres, section SM (27) Mokronoge – TS Kupres
Supervision over the performance of works of Ilumination of the Old Town Blagaj (Herceg Stjepan Fortress City) in Blagaj near Mostar
Project of Sustainable Management of Forests and Landscapes – Reconstruction / construction of the fire road Gornji Vlašani – Posušje, GJ Posušje in length of 3 km
Consalting services for Technical supervision of Works on primary school “CIM” Mostar
Supervision of construction-artisanal works on the project of reconstruction of war crimes courts in B&H (altogether 11)
Development of the main project and supervision of construction and electrical works at installation of VHF antenna at location Bukovik
Supervision on the construction of belfry of the church of St. Ivan the Baptist
Supervision over the rehabilitation of the right embankment along the Krupa River – Karaotok
Technical supervision of “Replacing the existing public lighting with the LED lighting”
Construction supervision of the external lightning of the walls of the Old Town Blagaj in Blagaj near Mostar – LOT 1
Preparation of main design of warehouse Opine
Development of investment-technical documentation for the construction of water collectors with pipeline and platforms for collecting rain water in returnee settlement Rabrani, LC Hrasno, Municipality of Neum
Development of project documentation for the reconstruction of a small hall of the Croatian Lodge “Herceg Stjepan Kosača” in Mostar
Development of project documentation for reconstruction of premises behind the hall of the Croatian Lodge “Herceg Stjepan Kosača” in Mostar
Services on drafting detailed design for energy efficiency rehabilitation of Psychiatric Hospital Mostar
Revision of the project documentation of the main rehabilitation project of plateau CPE Centar Skenderija, Sarajevo
Preliminary, main and detailed project of upgrading the hall in Mostar
Supervision over the reconstruction of room intended for placement of secure server room in Mostar
Main designs for construction, rehabilitation and reconstruction of fifty-four residential units in Orašje Municipality, LOT 2
Control of the production of stone fractionated aggregate on the quarry Delića Brdo
Technical cooperation on control of the production of stone fractionated aggregate on the quarry Ograina, Žepče
Material Testing Services and Quality Control within the project “Wastewater Treatment Plant in Bihać”
Testing of compressive strength of stone under the project of reconstruction of the “Braće Fejić” street in Mostar
Quality control of concrete on facilities within the wastewater treatment plant
Control of the production of aggregates for concrete at plant in Stolac
Control of concrete production at concrete plant in Stolac
Technical cooperation on quality control of concrete in the Paškić concrete plant at the location of Međugorje
Technical Cooperation on the Control of Concrete Production in the Concrete Plant at location of Blizanci, Čitluk
Control of Concrete Production in the Concrete Plant in Ostrožac, Cazin
Control of the production of aggregate on the quarry Lapišnica, Istočno Sarajevo
Control of concrete production at concrete plant in Odžak
Concrete production control at the concrete plant Kuzmanović Komerc d.o.o. Modriča at the location of Modriča
Analysis of soil samples for the designed radio-poles foundations in Congo
Quality control of concrete of subbase and embankment
Mission G41 and G42 – Bazaar, Mala Tepa, Mostar
Mission G31 and G32 for objects no. 2 and no. 3 of residential-business comlex “Kapetanovina”
Mission G31 and G32 for object no. 4 of residential-business comlex “Kapetanovina”
Geomechanical elaborate on location of future commercial building of Elekroprijenos B&H
Geomechanical elaborate for residential-business building “Cesars”, Lacina street, Mostar
Technical supervision of works on construction of the building for permanent accommodation of Agency for education and professional training, Rodoč bb, Mostar
Quality control of concrete during construction of residental-business object “Dva Cedra” in Mostar
Technical supervision over construction of the building of Cantonal court in Bihać, B&H. Supervision over construction-artisanal works on construction of the building in Bihać; Consortium of Institute IGH d.d. Zagreb and IGH d.o.o. Mostar
Technical supervision over construction of a new wing of the building of the Prosecutor’s Office of B&H in Sarajevo. Supervision over construction-artisanal works on construction of the building in Sarajevo
Quality control of concrete during construction of residental-business object “Oaza” in Dubrovačka street in Mostar
Development of technical solutions and technical documentation for fifty-four residential units in Mostar
Mission G23 (revision) for reconstruction and upgrading of the restaurant in Mostar
Geotechnical elaborate and geotechnical design – Mission G21 for the purpose of reconstruction, extension and upgrading business object in Mostar, Fortuna tours
Preliminary geotechnical design – Mission G1 – Vila Fortuna
Mission G23 – upgrading of residental object in Tito’s street in Mostar
Geotechnical report with geotechnical design – Mission G21 for Roof rehabilitation project of building of Red Cross Society of B&H
Revision of main geotechnical design for the purpose of reconstruction of the boarding house and bazaar – Onešćukova 23, Mostar
Geological-geomechanical investigative works for the purpose of construction of a residential-business object “Mljekara”
Services of geotechnical investigative works and preparation of geomechanical elaborate on the location of social housing building in Prozor
Revision of geotechnical elaborate with geotechnical design (Mission G23) – reconstruction and outhouse of residental-business object in a street Jusovina bb, Mostar
Missions G31 i G32 for object no. 1 of residental-business complex “Kapetanovina”
Geomechanical report and geostatic analysis of residential-business objects, blocks 4,5 and 6 (buildings 1,2 and 3), Luč in Trebinje
Geotechnical elaborate for residental-business object “Stara pilana”, E-12, Nevesinje
Design services on the project of rehabilitation of the structure and upgrading of the balcony on the building B2, Blažuj
Designing the main project of the structure of a business-warehouse facility in Safet Zajko Street, Municipality of Novi Grad
Main and detailed design of Structure of residential-business building in the street IV Viteške brigade 72, Ilidža
Preparation of technical documentation and supervision of works on the UniCredit Bank Office in Breza
Preparation of technical documentation and supervision of works on the UniCredit Bank Office Mepas Mall in Mostaru
Preparation of technical documentation and supervision of works on the UniCredit Bank Office in Rama
Preparation of technical documentation and supervision of works on the UniCredit Bank Office Kovačići in Sarajevo
Preparation of technical documentation and supervision of works on the UniCredit Bank Office in Čitluk
Preparation of technical documentation and supervision of works on the UniCredit Bank Office Dobrinja in Sarajevo
Preparation of technical documentation and supervision of works on the UniCredit Bank Office in Vogošća
Development of project documentation for the residential-business building “Mljekara”
Main project of business building extension “Termomont”
Verification services of Project of load-bearing structure for objects K-36 i K-37
Verification services of Project of load-bearing structure for objects K-34 i K-35
Detailed design of structure for residential-business building in Marko Marulić street in Sarajevo
Services of stability check of object in Marshal Tito street in Sarajevo
Verification services of Project of load-bearing structure for objects B1-B
Technical cooperation on quality control of concrete during the construction of the building for permanent accommodation of Agency for Education and Professional Training in Mostar
Quality control of concrete on a residential-business building “Mljekara” in Mostar
Testing the compressive strength and volume mass of concrete samples of residential – business object “Stara pilana”
Technical supervision over renovation works of the building of Cantonal court and Cantonal prosecutor’s office in Mostar; Consortium of Institute IGH d.d. Zagreb and IGH d.o.o. Mostar
Tunnel “Žaba” – Geotechnical design, appendix
Main design for the construction of the “Žaba” tunnel (L = cca 975 m) on the road M17.3 Neum – Stolac, Section Bročanac – Drenovac
Revision of documentation of the tunnel projects “Novi” and “Privorac” within the southern bypass of Mostar, section Miljkovići – Rodoč – connection to M17 – LOT2
© IGH d.o.o. | Powered by:
XSOFT